Move-in windows
Provide the assigned receiving time and the location authorized to accept freight.

Industries
Coordinate booth materials, displays and equipment cases around venue access and event handling windows. Plan both the delivery and the return movement before the exhibition begins.
Trade Shows & Events
Exhibition freight can involve assigned move-in windows, an event handling contractor and a separate outbound release. Share the venue instructions, packed cargo profile and event contacts early. Transportation coordination does not replace venue material handling or booth installation.
Freight Challenges
Provide the assigned receiving time and the location authorized to accept freight.
Identify fragile displays, cases and handling or stacking restrictions.
Confirm the event contractor and the party responsible for unloading and onsite handling.
Coordinate freight-ready time after dismantling and the return destination.
Related Transportation Services
Review time-sensitive event freight using the actual cargo readiness and receiving instructions.
Explore Expedited Freight →Evaluate dedicated trailer capacity for larger booth or display loads.
Explore Full Truckload →Review suitable international event cargo and the ground handoff into the venue or receiving facility.
Explore Air Freight →Shipment Planning
The end of the event does not automatically make the load ready to collect. Dismantling, packing and contractor release can change the pickup window. Identify the outbound contact and destination before the event, then reconfirm readiness when the cargo can actually move.
Operational Considerations
Measure cases and crates in their shipping configuration.
Provide venue or contractor contacts and any shipment identifiers.
Confirm who reports when the dismantled freight is packed and released.
Separate transport from venue handling, setup and installation.
FAQ
Provide venue and origin details, move-in instructions, packed dimensions, weight, required dates and event handling contacts. Include the outbound destination and expected move-out window.
No such activities should be assumed. Confirm those responsibilities with the event contractor and specify the transportation scope separately.
Yes. Identify the destination, packed cargo profile and outbound contact in advance, then reconfirm release and pickup readiness after dismantling.
Related Industries
Plan parts, assemblies and production-related freight around cargo readiness and plant receiving requirements. Review timing, equipment and cross-border handoffs before selecting transportation.
Explore Automotive →Coordinate materials and equipment deliveries around site access, unloading resources and the construction schedule. Review each load before committing pickup and receiving arrangements.
Explore Construction →Review packaged products, carton and pallet profiles, inbound transportation and inventory handoffs. Prisma Freight coordinates relevant freight and warehouse options around the shipment scope.
Explore Consumer Goods →Let's Move Forward
Tell us what you are moving, where it needs to go and when it is ready. Include the handling and receiving requirements so our team can review the transportation scope.